Hiton Valve Co.,Ltd.

Hiton Valve Co.,Ltd.

Professional Steel Industrial Valves Manufacturer
 search
News

Purchaseing FAQ of Hiton Valve




1. How long will it take to produce an order?

It is at least 35 days for the purchasing and production time with container order and 10 days for the sample. The reason why we take it long is purely guarantee the quality.

2. What is your minimum order?
Yes, usually 50pcs for each sizes, please contact us when you are trying to purchase less than $1000

3. What form of quotation do you offer?
FOB Shanghai or Ningbo (China), CIF and CNF Your destination

4. What is your payment term?
Payment is 30% deposit, 70% before shipment or 70 % L/C at sight for the container order 100% T/T in advance for LCL order or the sample order. We accept US dollar,Euro,GBP.etc

5. Does the sample for free or not?
The samples are free if they are common sizes,You need to pay the freight charge.

6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001, and there are as many as 6 times of test during the production of each product to ensure the quality.we have our own test centers, every tubes will be tested under our testing equipment before package.

7. How do you to package the product?
Internal wrapped with plastic foil, external wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required

8. How are the orders shipped?
By sea or air. We arrange up to the port of departure or port of destination (Shipment/ freight to be paid by the buyer).

9. How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,etc;

10. If you have other questions,please contact us.

Go Back 】 | 【 Print 】 | 【 Close this window

Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian

Copyright 2012-2015 © Hiton Valve Co.,Ltd. All Rights Reserved